Testimonials

ARIZONA CITY SANITARY DISTRICT HEADWORKS AND LIFT STATION JOC - MGC’s scope of work included, constructability review of Engineers design for a new headwork’s structure at the wastewater treatment plant, to replace existing headwork’s equipment with a new lined concrete barscreen structure, new climber bar screen, compactor, odor scrubber, replace existing influent pumps, install new flow metering equipment, and install all associated electrical and controls. The major challenge on this project was bypassing entire plant flow for the project to be constructed. | Role of Firm: Prime Job Order Contractor | Project’s Construction Cost: $985,218 | Construction Dates: ​01/09 – 02/10 Construction Phased | Project Owner: Arizona City Sanitary District | Reference Information: | Ms. Joanne McKenzie / ​Board Member / (520) 466-5203 Ms. Susan Versluis / ​Contract Admin. / (520) 466-5203
We were very pleased with MGC’s performance on our headworks and lift station JOC project.
- Susan Versluis, ACSD
FOUNTAIN HILLS LIFT STATION 18 JOB ORDER CONTRACT (JOC) - MGC’s scope of work on this JOC project included bypassing an existing lift station, removing existing pumps, piping, and supports and replacing with all new pumps, piping and supports. The challenges associated with this project included a fast track schedule, maintenance of plant operations (MOPO) at this operating wastewater treatment facility, and retrofit of an existing facility. Role of Firm: Prime Job Order Contractor | Project’s Construction Cost: $21,831 | Construction Dates: ​05/08 – 06/08 Construction ​Phased for Operations | Project Owner: Fountain Hills Sanitary District | Reference Information: | Mr. Ron Huber, P.E. / ​District Manager / (480) 837-9444 Mr. Bill Cunningham / ​Field Services Manager / ​(480) 837-9444
A fast track schedule, maintenance of plant operations, & a retrofit of an existing facility
- Ron Huber & Bill Cunningham